ローン: BTC Co, 11.2015
ヒントモードがオンになっています オフ
セクション間の迅速なナビゲーションのため

借り手

プロフィール
Baku-Tbilisi Ceyhan (BTC) pipeline carries oil from the Azeri-Chirag-Deepwater Gunashli (ACG) field and condensate from Shah Deniz across Azerbaijan, Georgia and Turkey. It links Sangachal terminal on the shores of the Caspian Sea to Ceyhan marine terminal on the Turkish Mediterranean coast. In addition, crude oil from Turkmenistan continues to be transported via the pipeline. Starting in October 2013, we have also resumed transportation of some volumes of Tengiz crude oil from Kazakhstan through the BTC pipeline. The pipeline that became operational in June 2006 was built by the Baku-Tbilisi-Ceyhan pipeline company (BTC Co) operated by BP. The pipeline buried along its entire length is 1768km in total length: 443km in Azerbaijan, 249km in Georgia, and 1,076km in Turkey The Azerbaijan and Georgia sections of the pipeline are operated by BP on behalf of its shareholders in BTC Co. while the Turkish section is operated by BOTAS International Limited (BIL).
  • 借り手
  • セクター
    社債
  • 借り手の正式名称
    Baku-Tbilisi-Ceyhan pipeline company (BTC Co)
  • 業種
    パイプライン

最も包括的なデータベースを探索

1 000 000

債券

80 234

167 970

ETF&投資信託

70 000

インデックス

最も効率的な方法でポートフォリオを追跡

  • 債券検索
  • ウォッチリスト
  • Excelアドイン

ローン情報

  • ***
  • ステータス
    付与
  • 種類
    ***
  • 表示
    ***
  • 1,630,000,000 USD
  • 契約締結
    11月 2015
  • 償還
    12月 2020
  • ローンの目的
    ***
  • ローンの詳細
    中間ローン, イスラムローン, 国際機関の参加, 劣後ローン, クラブクレジット, 多通貨ローン, 償還ローン, ECA付き取引, ESG
  • 決済レート、%
    ***
  • ローンの延長
    ***
  • ローンの増額
    ***
  • 追加トランシェのデータ
    ***
  • ローンの目的(詳細)
    ***
  • ローンの条件変更
    ***
  • 証券および保証
    ***
  • 追加情報
    ***

株式

参加者

  • 主幹事
    ***
  • シンジケートの他のメンバー
    ***
  • 株式と報酬
    ***
  • 投資銀行およびその他のエージェント
    ***
登録 is required アクセスを得るために必要です。