Bazalgette Tunnel, 2.375% 29nov2027, GBP (FIGI BBG00J89FKJ9, XS1726309286, WKN A19SYF)
国際債券, 保証付き, グリーンボンド, Senior Secured
国際債券, 保証付き, グリーンボンド, Senior Secured
|
Bazalgette Tunnel Limited is a special purpose entity set up to design, construct, own, operate and maintain the Thames Tideway Tunnel, a 25km tunnel running underneath the River Thames through London to collect excess storm water ...
Bazalgette Tunnel Limited is a special purpose entity set up to design, construct, own, operate and maintain the Thames Tideway Tunnel, a 25km tunnel running underneath the River Thames through London to collect excess storm water and sewer discharge between Acton Storm Tanks and Abbey Mills Pumping Station, from where it will pass through the Lee Tunnel to be treated at Beckton Wastewater Treatment Works.
|
|
|
|
|
|
|
| 次営業日 |
最も包括的なデータベースを探索
1 000 000
債券
80 234
株
167 970
ETF&投資信託
70 000
インデックス
最も効率的な方法でポートフォリオを追跡